The composite geomembrane (composite anti-seepage film) is divided into a film of HDPE geomembrane and two fabrics, with a width of 4-6m. The "Hongchen" composite geomembrane is tensile, tear-resistant, bursting, etc., physical mechanics The performance index is high, the product has high strength, good extension performance, large deformation modulus, acid and alkali resistance, corrosion resistance, aging resistance and good anti-seepage performance. It can meet the needs of civil engineering such as anti-seepage, isolation, reinforcement, anti-cracking and reinforcement in water conservancy, municipal, construction, transportation, subway, tunnel and engineering construction. Hongchen composite geomembrane can be used in unconventional temperature environment because it uses polymer materials and anti-aging agent is added to the production process. It is often used for anti-seepage treatment of dams and drainage ditches, as well as anti-fouling treatment of waste yards. Nowadays, the composite geomembrane anti-seepage construction technology has been widely promoted. Geomembrane welding is the most important in the construction process. Based on years of on-site construction experience, our company has concluded that it is not suitable for welding in geomembrane welding construction. The joints are cemented, and the welding method is as follows:
I. Preparation before laying 1. Foundation treatment: cleaning the geomembrane laying surface, requiring basic leveling, solid soil, no unevenness, cracks, etc. There should be no sharp objects, stones, iron wire, wooden sticks, etc. The turf and roots in the anti-seepage range should be removed, and the herbicide should be sprayed on the weeds.
2. With the membrane contact surface, a sand or clay layer with a small particle size is laid as a protective layer, and the thickness of the protective layer is not less than 30 cm.
2. Construction and welding of composite geomembrane 1. Splicing composite geomembrane welding and splicing of composite geomembrane is carried out by the construction workers with rich experience in “Hongchen†construction. The welding equipment selects the automatic temperature-regulating geomembrane welding machine, and the auxiliary equipment is 700W hot air welding torch. After the first composite geomembrane is laid, the sides to be welded are overlapped ("Hongchen" composite geomembrane has been reserved for 20cm-25cm from the welded side when leaving the factory), and the second reverse is laid on the first film. . Adjust the edge of the two film welding edges so that the overlapping width is 10cm-15cm. For the welding of composite geomembrane and composite geomembrane (ie membrane and membrane), on-site welding test shall be carried out before welding to determine the welding temperature and walking speed of the welding machine. The control temperature of membrane and membrane welding is generally controlled at 300 °C-400. °C, the walking speed is generally 1.5-3m/min. At the same time, it is necessary to ensure the surface of the membrane is clean.
2. Quality control of composite geomembrane splicing (1) Composite geomembrane welding should be carried out in the weather without rain or strong wind. Construction workers should wear flat shoes or soft rubber shoes. It is strictly forbidden to wear spike shoes to avoid stepping on composite geomembrane. Welds should be inspected carefully, mainly to see if the two welds are clear and transparent, with or without bubbles, welds, melting points or weld runs.
(2) First select the area to be inspected, and the length of the weld of the test section is about 1.5m-3.0m. The two ends of the selected weld section to be inspected are sealed with a welding gun, and the pressure gauge is used. The gas cylinder clamps the gas needle, inserts the gas needle into the air passage of the weld to be inspected (only pierce the upper layer of the anti-seepage membrane, do not pierce the two layers), and the pressure is controlled according to the requirements of the geosynthetics test procedure at 0.5- 2Mpa, the time is around 30s. When you pump up, if the gas inside the weld is leaking with the gas needle, just plug the needle into the plasticine, hit the air, press it with your finger before the gas needle, observe for more than 30 seconds, and the pressure is not reduced. qualified.
(3) For unqualified welds, hot air welding guns should be used for repair welding vertical and T-slot treatment: vertical seams should not be spliced ​​too long, generally controlled at about 80cm, which increases with the progress of the project. T-slot treatment: According to the position of the T-slot, the splicing of each layer is first processed. Since the glue can not be repaired by the welding machine, the excess part can be cut off after each layer is glued, so that the glued T The seam forms a flat surface. After being bonded, it is double-sided patched for reinforcement according to the situation. If the composite geomembrane is damaged during the construction process, it should be repaired in time. Generally, the double-sided patch is applied by the adhesive method.
3. Control of construction strength of composite geomembrane In the construction process, vertical seam stitching and T-slit jointing speed are required to be greater than the filling speed of the dam; therefore, under the premise of ensuring quality, it is stable first and then fast. The pace of construction is carried out, and the speed is continuously increased to ensure the progress of the project.
Http://news.chinawj.com.cn Submission:
Phlizon is a new high-tech enterprise, specializing in research, production, sales services of LED Grow Light.The headquarters is located in Huilongda Industrial Park, Shilongzai ,Shiyan Street, Baoan District, Shenzhen, China.So far we have overseas warehouses in the United States, Germany, the United Kingdom, and Spain.we strive to provide convenient and highly efficient solution services.
Adopts Samsung LED 5630 as light sources, which has the advantages of high performance, low energy consumption and stability.
Input voltage:AC100-240V,easy to use, safe and suitable for any country.
LED Lifespan is reach up to 50,000 hours.
Suitable for all kinds of plant growth, flowering and yield
Safe and environmental protection, free from pollution and harmful substances
Features:
High power brand Samsung 5630 led with high par vaule100-277v/200-480v for industrial planting
Higher PPFD value per unit area
Full Spectrum Grow Light mimics natural sunlight for different period of growth
Passive heat sink and die casting aluminum shell
Aluminum body for a good heat-dissipation
Elegant appearance
Easy to install by minute
More convenient and simple for maintenance
Energy saving,environmental friendly
3-5 Year warranty
Applications
Hydroponics,Horticulture,Agriculture and Greenhouse
Locations:Farm,Exhibition,Garden,Home,Urban,Bonsai,and University Lab
Growth of Fruits,Vegetables,Flowers and so on
Seeding,Rooting,Breeding,Flowering and Fruiting period
Phlizon is the manufacturer factory and we sell our products at a low price directly, besides all our Power supply, Fans and wire all are Fire-resistant material,won't catch fire.
We currently have warehouses in the UK, USA, Canada,Spain, and Australia,and we are working on opening more warehouses in other countries to shorten our delivery time.
We have strong OEM/ODM capabilities, with experienced teams, full post-sales support and an established quality control system.
We promise to provide high-quality products with competitive prices, fast delivery, and responsive services for our clients.
Cautions
1.This light is not waterproof, do not spray water
2.Never touch and hit the Light while it is working.
3.Lighting work environment is -20 ~ 40 °C, 45% ~ 95% RH.
4. Please cut off the power when there is a lightning strike.
5. Make sure that the mounting position can withstand 10 times the weight of the light.
PH Linear Series,Quantum Board Grow Light,Quantum Board Grow Light Kits,Led Quantum Board Grow Light,200W Quantum Board Grow Light
Shenzhen Phlizon Technology Co.,Ltd. , https://www.szledaquariumlighting.com