1, waterproof construction should be coated with waterproof film

2. The waterproof project should be done after the concealed construction is completed and accepted.

3. 2 water storage tests should be done after waterproof construction is completed.

4, the bathroom waterproof layer should be no less than 1.8 meters

5, floor drain, yin and yang angle, pipeline and other places to do more waterproof

6, the floor drain should use deodorant floor drain

7, hot and cold water pipe left hot right cold

8, the water pipe try not to go from the ground

9. The cold water pipe must have a protective layer of 1CM in the wall, and the hot water pipe is 1.5CM, so the groove should be deep.

10, PPR pipe is to consider the thickness of the tile, so that the pipe will not be exposed

11, cooking only a few minutes, washing vegetables for a long time, the water bucket must buy big

12, the faucet and the basin must be matched, if you can't get it, you can't install it.

13, the toilet can not be installed with cement, use silicone

14, the toilet, faucet should be protected after installation

15, when buying a toilet, consider the pit distance of the toilet

16, the washing machine should consider whether it is drainage or drainage

17, it is best not to install a phone in the bathroom, easy to get wet

18, the mirror in the bathroom must first consider the size, otherwise the mirror headlights are easy to install high

19, the bathroom pipe is best to repair the repair hole

20, strong electricity weak electricity can not be worn in the same pipe

21, left zero, right phase grounded

22, power socket from the ground 300, switch 1.4 meters

23, the switch should not be installed behind the door

24, a lot of sockets should be good

25, 16A socket for high-power appliances, such as electric ovens, etc.

26, the cassette must be used well

27, the cassette must be matched with the panel, otherwise it may not be able to install

28, the cross-sectional area of ​​the wire in the PVC wire pipe shall not exceed 40% of the cross-sectional area of ​​the wire pipe

29, the bedroom air conditioning do not put on the bed

30, air conditioning holes should be considered to tilt outward, otherwise the rain will come in

31, the lamp should consider double control

32, the bathroom is best to install splash-proof socket

33. Consider a socket on the balcony.

34, the wire trough should be horizontal and vertical, arranged for good photos, easy to use later

35, the public flue should be installed with a check valve

36, the purchased electrical appliances must be well prepared for workers to read the instructions

37, instructions and warranty card and other information must stay in the mason

38, cement can not be used beyond the factory period of three months

39. Different varieties and labels of cement cannot be mixed.

40, yellow sand must use river sand, sea sand is salty and dangerous, there will be corrosive, taste with the mouth will know

41. Wall tiles should be immersed in water for more than two hours.

42. Wall tiles should buy more pieces, don't buy less, otherwise it is prone to color difference.

43. There can be no two rows of non-complete bricks on one wall.

44. Clean the tiles immediately after the seam is completed.

45, the floor is covered with marble (light color), the back of the stone should be waterproof

46, the angle should be cut at a 45 degree angle

47. The floor tiles should be inclined to the floor drain, otherwise it will accumulate water.

48, the wall brick hits the pipe mouth to adopt the form of cutting, so it looks like a whole piece of brick

49, ground marble should dry shop

50, the floor tiles must be resistant to dirt, slip, not to look good

51, matt tiles difficult to clean

52, balcony floor tiles should pay attention to the drainage direction

53, the ground keel is best to use dry larch

54. After the large wooden board is bought, it must be sawn and dried.

55, woodworking to enter the field must first play the horizontal line of the house

56. When the color panel comes in, buy a paint brush again to prevent it from being soiled.

57, ceiling fan can not be installed on the ceiling keel

58. Pre-color picking when constructing the color panel

59. The hanging ribs of the ceiling shall not be more than 300 from the wall.

60, gypsum board should be fixed with countersunk head self-tapping screws, enter the board surface 1~2MM, and do anti-rust treatment, can not use gun nails

61, the distance between the plasterboard nails must not exceed 200

62. The plasterboard should have a 3MM seam with the wall for anti-crack treatment.

63, the gypsum board at the corner of the corner is best to do the protection of the positive angle

64. The top and bottom of the wooden door should be painted.

65, the bottom of the bathroom door cover should be brushed waterproof

66, the size of the door should be consistent

67, furniture should try not to let the woodwork do, do not do well

68, the cabinet as much as possible to buy the whole, the woodwork is not good, the design is not good

69, each size must be considered, it is more troublesome to change

70, do your own sliding door, do not do dark track, no way to repair later

71, if the bathroom is small, try to do the sliding door, do not open the door, occupy the place

72. If you are not sure about the woodworking work, you must communicate with the foreman. Do not let them make their own claims.

73, money is the last word in your hand

74, there are children in the family, the glass should be used less

75, must let the workers look at the drawings

76, kitchen drawers are very useful

77, the floor wood keel flatness is 5MM

78, the wool floor should be laid at 30 degrees or 45 degrees, leaving 2~3MM between the board and the board, the seams should be staggered

79, 8~10MM seams should be left between the floor and the wall

80, when the length of the composite floor exceeds 8M, consider the expansion joint

81, try to use the MDF as little as possible

82, hinges and hardware must be used well

83, Yuba should be installed on the wooden keel, can not be directly mounted on the ceiling

84, medium and dark latex paint construction should try not to mix water, otherwise it is prone to color difference

85. Gypsum board joints should be bandaged

86. Where there is a gap in the wall, it is better to have a cool cloth.

87, the original putty on the wall is best to eradicate, or brush the glue to seal

88, try to buy paint of well-known brands, decoration company recommended or foreman recommended by the foreman, try not to use

89, the weather is too humid, paint does not brush

90. The polishing of paints and coatings should be carried out after completely drying out.

91. The next paint construction must be carried out after the previous paint has dried out.

92, metal surface paint to do anti-rust treatment

93, the weather is too cold, the quality of paint construction will be poor

94. When the door is painted, use the textured paper to stick the hinge and the door lock.

95, the day is too hot, pay attention to ventilation

96. When painting wallpaper, brush the oil on the wall.

97. When affixing wallpaper, remove the panel of the switch and socket.

98, bright, mercerized latex paint to be completed at one time, the color difference is easy to make up

99. After the skirting line is installed, use putty and latex paint to make up the seam.

This article is edited by Suzhou Home

Screen Spline

Screen spline is a vital component in the construction and maintenance of window screens and screen doors. It serves the crucial purpose of securing the screen material firmly in place within the frame, ensuring a tight and durable fit. Made from flexible materials such as rubber or vinyl, screen spline is designed to be inserted into a groove or channel along the edges of the frame, holding the screen securely and preventing it from sagging or coming loose.

The primary function of screen spline is to create a tight seal between the screen material and the frame, effectively keeping out insects, bugs, and debris while allowing fresh air to flow through. By securely holding the screen material in place, it prevents gaps or openings that could compromise the effectiveness of the screen in providing protection and ventilation.

Screen spline also plays a crucial role in maintaining the structural integrity of the screen. It helps distribute tension evenly across the screen material, preventing it from stretching or warping over time. This ensures that the screen remains taut and free from wrinkles or sagging, enhancing its appearance and functionality.

In addition to its practical purposes, screen spline also offers versatility in terms of design and customization. It is available in various sizes and materials to accommodate different screen thicknesses and frame types. This allows for flexibility in choosing the appropriate spline for specific applications, ensuring a secure and snug fit.

Whether for residential or commercial use, screen spline is an essential component in the construction and maintenance of window screens and screen doors. Its purpose of securely holding the screen material in place, providing protection against insects and debris, and maintaining the structural integrity of the screen makes it an indispensable part of any screen installation. With its functionality and versatility, screen spline ensures that windows and screen doors can effectively fulfill their intended purpose of providing ventilation, protection, and comfort.

Screen spline,Window screen,Spline tool

Jinwu Glass Fiber Co., Ltd , https://www.jinwuwindows.com