Blank Room Decoration Process Blank Room Decoration 5 Steps

Many people do not understand the decoration process of the rough house, do not know how to start when handing the house, the whole process to the decoration company also feel very limited, then you first understand the rough room renovation process , and rough room decoration considerations .

Blank room renovation process

Process I. Property Approval and Housing Design

Before the start of construction, you need to go to the property center to complete the decoration permit and other formalities. Fill in the form with the relevant basic information, relevant responsible person, pay the deposit at the same time, apply for the pass (the construction party enters the use of the community, the cost of the construction party) and other procedures.

The next step is the exchange of design on the house. The owner proposes the house that will be decorated, and the designer will complete the corresponding design work.

To confirm the design drawings, it is necessary to check with the decoration company the detailed information on the renovation budget and the related construction projects in the decoration contract. After confirming the contract content and signing it, it can be started.

Process II, hydropower reform

Hydropower renovation is the first project in construction. There are many things to do and it is also one of the most important renovation projects.

The general construction period is 3-7 days (depending on the number of reconstruction projects), as the hydropower reform itself is very important, so when the renovation workers are constructing, the owners also need to understand the corresponding details at the scene.

Even if the owners are not very familiar with this, I believe that the owners will not have too many loopholes in the construction site. Because the hydropower project is difficult to carry out after the completion of the repair work, it must be done in the renovation of hydropower projects.

Process 3, bricklayers and carpenters

The construction period of bricklayers and carpenters is based on the difference between different regions and processes. Whoever is first and then can be determined based on specific conditions. Because waterproofing and primary treatment will be carried out at this stage, materials required for waterproofing must be entered on time.

The construction period of bricklayers is generally 7-30 days (floating increases, some of the time required for parquet slanting will be very long), because now the general carpenters are doing less, the duration is generally about 7-20 days. When the two projects are completed, the owners need to do a good job of acceptance.

Process IV, paint

The paint is the final step in the renovation, including paints such as latex paint and wood products on the top of the wall, which is surface engineering.

Before the beginning of this phase, the medium-term payment is generally required, and part of the previous period is settled according to the contract or agreed-upon good ratio.

The paint is generally determined according to the different needs of the specific area, so be sure to determine the part of the house that needs to be painted before buying the paint to avoid waste on the material. After the completion of this part of the project, the workers can evacuate the site for cleaning, garbage removal and subsequent item procurement.

Process 5, installation

After the renovation is completed, even if the entire renovation project is done half or two-thirds. Owners need to install accessories, cabinets, lamps, switch socket panels, interior doors, custom wardrobes, hardware, and flooring.

If some of the work needs to be installed by the decoration company, it is necessary to declare in advance with the decoration company that some of them are on-site service, which can save some of the renovation funds.

The above is the blank room renovation process that we brought to everyone. After watching it, we have more understanding of the decoration process and hope to help everyone!

Blank Room Renovation Budget Blank Room Renovation Cost Decoration Process

Composite Strain Gauge

Composite resistance Strain Gauge is a kind of sensitive element by using resistance-strain effect to transform the strain of specimen into resistance change. It is the most widely used strain test element. The load cells used in weighing and measuring field mainly include resistance strain gauge type load cells, capacitance type load cells, vibrating string type load cells and so on, most of them are resistance strain gauge type load cells.

The resistance strain gauges produced by our company has the advantages of long liability and good uniformity, the functions of creep and temperature self compensation, suitable for batch production of alloy steel, aluminum ally and stainless steel load cells with high accuracy, and for producing other load cells and force and strain measuring elements.

Resistance Strain Gauge,Composite Type Strain Gauge,Strain Gauge For Load Cell,Composite Strain Gauge

SHANDONG JINZHONG SCIENCE & TECHNOLOGY GROUP COMPANY LIMITED , https://www.chinagoldbell.com