Bathroom hardware and sanitary ware installation, there are so many more attention

There are a lot of new heads of households who are wondering. The decoration of the new house is almost the same. Is it possible to install the bathroom pendant? In fact, the bathroom hardware pendant does not need to be installed too early. Today, we will introduce the installation time and specific of the main hardware pendant. Installation location.

installation time:

Pendants are usually installed after the installation of large products. Need to hit the eye with a hammer drill on the wall. This is a very important thing to note. It is recommended that the professional master use a glass drill bit to first open the hole of the tile and then use the impact drill to hit the cement, thus avoiding cracking the tile. In the event of a cracked tile, it can be cumbersome and the project is huge.

Installation location:

1. Towel rack: mainly installed outside the bath pavilion, about 1.8 meters above the ground. A bath towel is placed on the upper layer and a towel can be placed on the lower tube.

2. Double tube towel holder: can be installed on the empty wall in the center of the bathroom. When installed above the single-tube towel rack, it is about 1.6 meters away from the ground; when installed separately, it is about 1.5 meters away from the ground.

3. Single tube towel rack (foot towel rack): can be installed on the empty wall in the center of the bathroom. When installed under the double-tube towel rack, it is about 1.0 m from the ground; when it is installed separately, it is about 1.5 m from the ground.

4. Single cup holder, double cup holder: generally mounted on the wall on both sides of the washbasin, in line with the cosmetic frame. It is mostly used to place toothbrushes and toothpaste.

5. Toilet brush: It is installed on the wall on the side of the back of the toilet. The bottom of the cup is about 10 cm away from the ground.

6. Soap nets, soap ashtrays: Also mounted on the walls on both sides of the washbasin, in line with the dressing table. Can be combined with a single cup holder or a double cup holder. Soap nets can also be placed on the interior walls of the bathroom for easy bathing. The soap ashtray is placed on the side close to the toilet to facilitate the soot.

7. Single-layer shelf (dresser): mounted on the top of the washbasin and under the vanity mirror. The height from the washbasin should be 30 cm.

8. Double-layer shelf (make-up rack): Install on both sides of the washbasin.

9. Rag hooks: Generally, they should be placed on a wall that is not obvious, or placed under the towel rack, about 50 cm above the ground.

10. Clothes hook: It can be installed on the wall outside the bathroom, and should be at a height of 1.7 meters from the ground. Used to hang clothes during bathing. A plurality of clothes hooks can also be used in combination.

11. Corner glass shelf: It is mainly installed on the corner above the washing machine. The distance between the frame and the washing machine should be 35 cm. Used to place detergent, soap, detergent and the like. It can also be installed on the corner of the kitchen to place seasonings such as oil and wine. Multiple corner frames are assembled in a combination of visual space locations.

12. Tissue holder: It is installed on the side of the toilet, easy to reach by hand, and less obvious. Generally 60 cm off the ground is appropriate.

Pile Driver

Ground Screw driver,for installing ground screw, mainly applied for mounting garden fences,traffic guidancs,advertising boards,carports,flagpoles,wooden houses,Constructional Industry and etc. Electric tool max. power consumption is 1800W-5000W and workers can install more effective and saving time. Manual tool also widely used because of easy installation.

Driven piling is well known for the following advantages for construction issues –

Relatively small and lightweight equipment is required
Relatively small cross-section and high strength helps penetration in firm soil
Require minimal site preparation
Spoil free means minimal cost for disposal of site debris
Cost-effectiveness where many piles are required
High productivity compared to traditional concrete raft foundations
Suitability for a variety of ground conditions.

Honde Ground Screw, equipped with the most sophisticated installation machines, ensures your ground mount installation in any soil environment and
any applications is handled with precision and speed. Honde have developed two type of machinery with the strategic partner for ground screw installation,
the electric pile driver and Manual Pile Driver.

Electric Pile Driver,Screw Pile Driver,Hydraulic Pile Driver

Hebei Honde Plastic & Metal Co., Ltd. , https://www.foundation-system.com