Villa decoration design and construction should pay attention to the details of consideration

1. The bathroom with high frequency of daily use should be inspected in advance before the bathroom of the villa. After determining the product style, it is necessary to determine the reserved position of the bathtub, cabinet, washbasin, shower, etc. according to the actual size, to avoid future Improper reconstruction will cause rework and will make the future decoration more beautiful.

2, you can go to the building materials market to look at the washing equipment in advance, reasonable arrangements for drying space, sunny and rainy days should be considered.

3, the floor drain should be prepared before laying the floor tiles. The water storage test must be done before the bathroom and kitchen floor are laid.

4. The current villas are basically rough houses. There are not many mop pools reserved in advance, but in daily use, the mop pools are still necessities, and the mop pools on the market are mostly round, even if the size of the square is not large. You can consider your own brick pool, villa decoration. Paving the tile with the same color as the bathroom, practical and beautiful.

5, the room door to stay bigger will make the room look stylish, more visually comfortable.

6. The designer will design the partial ceiling height for uniform size. The villa should be carefully observed when decorating. Please increase the height of the room as much as possible to increase the sense of space and comfort. It is not recommended to make a ceiling, it is time consuming and consumable, and the effect is probably not as obvious as expected.

7, attention to detail processing when designing. In addition to the living room, master bedroom and other areas that need to be considered, some transition spaces also need special attention. For example, a well-decorated porch will have a good visual effect.

8. Check the location of the roof drain pipe in advance to ensure that the water flow affects the plants and supplies in the yard. Also pay attention to see if there is dripping noise.

9, marble plate will produce a larger color difference with the sample, the pursuit of perfect customers is best to choose a good plate of ready-made stone business, on-site processing.

10, pay attention to the location of concealed water and electric pipelines, try to avoid when trying to nail things to the wall to avoid leakage or leakage.

11. The video intercom system is one of the necessary functions of modern villas. It is necessary to consider the reserved video intercom calls on each floor, and pay attention to the line reservation at the entrance door.

12, try to reserve more sockets in the living room, master bedroom and other rooms with high frequency.

13. The study room considers reserved ground plug and network cable in advance. The location of the desk and the computer circuit need to be considered in advance. Closed-circuit television should also leave as many jacks as possible in each room.

14. Before the hydropower transformation team enters the market, the villa decoration. It is necessary to determine the professional whole cabinet business, and confirm the design drawing early. The reasonable design of the position of the range hood, sink, flue, refrigerator, etc. will make the space more reasonable and beautiful. In addition, the kitchen needs to reserve sockets as much as possible. The use of household appliances by modern households is generally increasing, and the use of the plugs will affect the appearance. In this regard, cabinet designers will be more comprehensive than the decor designer's recommendations.

15. Check if there is drainage or water supply in the yard. Customers who like to plant flowers and grow vegetables can reserve space for tools in the yard.

16. Before the villa is designed and decorated, the water supply pipeline and the heating pipeline must be pressed in advance to check whether water is leaking, so as to avoid unnecessary losses.

17, solar energy should be booked in advance before tiling, villas joined. Install solenoid valves in advance.

18. If the stairs need to be paved with marble, you need to extract the size after the living room and bathroom bricks are finished. Including the leveling of the wooden floor, it is also necessary to do it after the living room and bathroom bricks are finished. If these work are advanced, it will inevitably lead to errors.

19. The ordering period of the door is relatively long. It takes about 30-45 days. Customers who are eager to check in must be reserved in the door opening.

20, the heating pipeline as much as possible, if you can book in advance, the villa is hardcover. According to the dealer's suggestion to reserve the pipeline, the room will be more beautiful and beautiful. Villa design. This is also a problem that many owners are easy to overlook.

Stainless Steel Bread Basket

Bread Basket,stainless wire basket,stainless wire bread basket,Metal Wire Bread Basket,steel bread basket,etc. we offered that you can trust. Welcome to do business with us.

Kichen Rack is made of high quality 304 stainless steel, This kind of material steel luxury, never rust, resist corruption, easily clean, safe, healthy and durable. Prevent rust or chemicals from contaminating food and damaging health

Stainless Steel Wire Bread Basket,Metal Wire Bread Basket,Creative Bread Basket,Versatile Bread Basket

Shenzhen Lanejoy Technology Co.,LTD , https://www.szbrassnuts.com