In the home improvement process, there are many disputes related to decorative materials. To sum up the reasons, it is nothing more than people often say "the shuffling of the construction party", and "the owners of the material supply will affect the construction progress and quality." Therefore, material acceptance must be done during the renovation.
- Material acceptance:
&8226; Time for acceptance of material acceptance by the other party to the contract: After the material has been purchased, the purchaser needs to notify the other party to the contract to prepare for acceptance of the material. And this acceptance is best arranged as soon as the material comes into play. Therefore, the agreed acceptance time is very necessary. In order to prevent material from entering the market, the other party does not have time to accept the material and affect the construction progress.
The inspection and acceptance personnel specified in the contract must be present at the time of material acceptance: Whether it is the person in the home improvement industry or the consumer, it seems that the contract has not risen to the legal point of view. However, the home improvement contract itself is a legal document and it may cause unnecessary trouble if it is not taken seriously. Take the material acceptance as an example: In the relevant chapters of the home-installed contract, the author once suggested that the material acceptance should be clearly defined by the acceptance person. However, in actual operation, parties A and B of the contract often do not take seriously the material acceptors specified in the contract. It may be that the acceptance person specified in the acceptance inspection is not present (the acceptance person has not authorized the acceptance person as contracted). Maybe the acceptance person is on the scene but he has no responsibility for acceptance. Strictly speaking, there are legal loopholes in doing so.
The acceptance procedure must be strict: The inspector should perform the necessary inspections for each material contract specified in the contract, such as material quality, material specification, and material quantity.
The inspection and acceptance person specified in the contract shall sign on the acceptance form: If the inspection result material is qualified, the acceptance person shall sign the material acceptance form. This is a more complete process. Because the author encountered such a thing, the owner accepted the material when the material came in, but did not perform necessary procedures at that time. Afterwards, the owner repented, and he refused to accept the results of his acceptance. However, since the other party has no evidence in hand, there is no way to do so.
Hidden project Home Furnishing Trick entrance decoration Home improvement Home decoration decoration