One-handed delivery of money, one-handed delivery. What you give is real money, and you must be a good house for quality clearance. Frequently people complained about the unpleasant places after they bought a house, what leaked house, too much noise, and so on. Many of them were not serious because of the acceptance of the house. Acceptance of new houses, it is plain to check the goods you bought, sample, the following describes a few new home acceptance tips and new housing acceptance considerations and tools needed.
A new house acceptance tips1. Whether the appearance and internal structure of the house is the same as the sales brochure and whether the door opening size is convenient for furniture access.
2. Whether the doors and windows are stable and sealed, and whether noise is generated during switching.
3, floor, wall, ceiling whether there are gaps, cracks, water stains, plaster is off.
4, visual, intercom system is normal.
5. Whether the switch can be switched freely or not, and whether there is power (Please use a pen test).
6. Whether the toilets, kitchens, drainage, toilets, bathtubs are operating normally, whether there are cracks, less accessories
7. Whether the Toilet or kitchen floor drain is sufficient (to prevent the outflow of water when an accident occurs).
8, the size of the console, whether the streamlined use.
9, kitchen, toilet ground should be closed for 24 hours, check the downstairs ceiling and adjacent wall surface leakage.
10. Use the ruler to clearly measure the inside diameter of the famous house and record it carefully to facilitate the decoration design and purchase of furniture.
Carefully do the above ten points, you will not have to worry about.
New housing acceptance considerations1, the relevant contract do not forget to sign
When signing the contract, the relevant details should be clarified, including the time of house closing, the housekeeping procedures (such as the first-out house, and no-objection re-acceptance, etc.); the specific detailed acceptance criteria specified from the supporting facilities to the deliverables of the house during the acceptance of the new house , It is best to attach design drawings and construction drawings, and indicate in the contract that it shall prevail.
2, two books and one table remember to
The acceptance of the new house requires the developer to obtain two books, “Residential Quality Assurance Certificate†and “House Use Instructionâ€, so that they can be repaired at a later date when quality problems arise. A table is the "Completion Acceptance Record Form", at the same time require developers to provide the national survey of professional surveying and mapping units on the actual measured data to see if there is an agreement with the purchase contract, so as to make the issue as soon as possible to resolve.
3, view the housing structure area
When the new house is accepted, the owner should first check whether the drawings in the sales contract are consistent with the actual conditions of the house; whether the structure of the house is the same as the original plan. Secondly, we should check whether the housing area has actually been measured by the real estate department and whether there is any difference in the area signed with the contract.
4, after the first inspection room repossession
When accepting a new house, the owner should insist on “a priori receipt†and submit the problems found during the acceptance of the new house to the developer in writing and have them sign for it so as to avoid leaving troubles. Or, you may indicate on the house receipt document that "the indoor situation is not clear" or "the condition of the building is not known."
Three new house acceptance key tools1, vertical detection ruler
Uses: Verticality detection, level detection, flatness detection, home improvement supervision is the most frequently used detection tool. Detect whether the wall surface and the tile are flat and vertical, and check if the floor keel is horizontal and even.
2, vernier caliper
Uses: Measuring length, inner diameter, depth, is a widely used high-precision measurement tool, consisting of two parts, the main ruler and the cursor that can be attached to the main ruler.
3, drum hammer
Uses: Mainly used for empty walls of houses.
4, multimeter
Uses: Test all power sockets and weak currents are unblocked, composed of three main parts: header, measurement circuit and switch.
For commodities such as houses, when receiving goods, you must be carefully checked and accepted, and you will be able to afford the hard-earned money! Well, the above is some knowledge about acceptance of new houses and I hope to help you. If you need to know more relevant knowledge, please pay attention to this website information channel.
House inspection furniture brand entrance decoration switch furniture toilet decoration design housing toilet door
Smart Wall-Hung Toilet,swimming pool and spa,spa hydropool,swim spa accessories,inground spa pool
Guangzhou Aijingsi Sanitary Products Co.,Ltd , https://www.comoxvalleyhottubs.com