Second-hand housing has become one of the first choices for modern young people to buy a home. It is not only cheap but it is often located in urban areas. However, second-hand houses have some or all of their own deficiencies, and the following points must be observed during the construction of the renovation:
First, can not be ignored second-hand housing acceptance:
Since second-hand houses have been living for a period of time or even 5 to 10 years or more, whether there are any problems in quality or whether they have been overhauled is a problem to be solved before the renovation. Except for some unseen hidden projects that need to be inspected and judged, Some of the seemingly new parts must pay special attention.
Covert Projects: Check the aging of old wires, the corrosion of water pipes, and the problems of early construction violations;
Wall: If the wall or roof of a new brush is used to cover up the cracks in the walls of the house or seep in the ceiling, buyers should pay special attention to similar situations.
Furniture: should be to see whether it meets their needs, whether the new and old conditions should be included in the list of changes; whether there are serious damage to the windows and doors, etc.; therefore, these must be accepted in the fine-tuned house model to be relatively safe.
Doors and Windows: Pay attention to whether the doors and windows are aging, if the problem is serious, you must remove the redo;
Second, the design structure is also a savings:
The decoration of second-hand houses should not be done according to the imagination of the owners, but it should be based on actual needs, so as to ensure no waste. Some decoration companies always consider all the points that can be saved as dismantlable in order to be able to obtain more benefits. This will cause great waste for the owners. There are many differences between second-hand house decoration and new house decoration, and it is more prone to waste and pollution. To sum up, one word is “Design Structure Retention is a Mustâ€, and the owner should pay attention in these aspects.
Third, the second-hand housing budget should do this:
The budget price and the amount of construction are inseparable. The work done on one of the multiple storey floors: there is a wall surface treatment; all the facilities in the bathroom and kitchen, including the removal of the tiles are newly renovated; and the house is a duplex structure with an attic. The homeowner puts the floor in the attic, and now the customer wants to make a bathroom in the attic again. This is more complicated. First, there is not much space in the attic, and the layout is not good. Secondly, the toilet has to consider the location of the upper and lower water. Waterproof problem.
Remind the Owner: If it is not necessary, try to preserve the facilities.
Demolition and transformation of several points need to pay attention:
1. Waterway reconstruction is like clearing blood vessels
There are many unreasonable layouts or corrosion of the existing waterway pipelines of second-hand housing, so the waterway is thoroughly inspected. If the original pipeline is a galvanized pipe that has already been eliminated, all of it must be replaced with copper pipe, aluminum-plastic composite pipe or PP-R pipe during construction. The PP-R pipe has been used more recently. Must be replaced.
2, circuit transformation is very deadly
Second-hand housing generally has the phenomenon of simple circuit distribution, aging of electric wires, illegal wiring, and so on, which can no longer meet the electricity demand of modern households. Therefore, it must be completely rebuilt and rewired during the renovation. Since aluminum wire was used in the past, we need to replace it with the copper wire we are currently using, and we must use PVC insulated wire protection pipe. For the installation of air conditioners and other high-power electrical lines to run separately. In simple terms, it is to come back again.
As for the socket problem, it is necessary to add more sockets, because the sockets for second-hand houses cannot reach the current number of electrical appliances, so this must be changed.
3, tile removal and renovation of the floor focus more:
When smashing wall tiles and floor tiles, avoid crushing the sewers with debris; only solid wood floors, engineered wood floors, and bamboo floors with a surface thickness of 4 mm can be refurbished. In addition, local refurbishment can also cause new and old differences between floors, so consumers cannot blindly refurbish the floor.
4, "surface" articles to do a good job
In the renovation, the transformation of the second-hand housing walls, floors, ceilings is the most likely to be neglected, the original decoration of the old houses are generally used hydrophilic plaster putty, need to be completely removed after the use of water-resistant putty.
5, consider the door and window update
Aging doors and windows is also a prominent issue in second-hand housing, but if the material is strong and you also like its style, in general, as long as repainting can be a new look, but the wooden doors and windows from the skin, deformation, must be replaced. In addition, the surface of steel doors and windows falling off the paint, the main corrosion or cracking, in addition to unsafe, it is difficult to restore the original state, in order to not affect the use of results, it should be removed to redo.
6, to give a little bit of love to the furniture
After the Chinese have generally taken over new houses, it is imperative to dismantle old furniture and buy new furniture. However, it does not measure the value of furniture. This is something that needs attention. Sometimes we can keep it because the furniture is poisonous. Gas volatilization takes a long time. Now it will be completed and re-float, and it will be based on resource conservation.
7. Closed water test is the most important and essential;
V. Several safety and environmental issues:
1, second-hand housing must be cleaned and disinfected
Since second-hand housing has experienced many people living, there will be some material that cannot be estimated, so it is best to disinfect the entire housing after the renovation. In particular, if you want to retain furniture, you can disinfect it after the maintenance is completed. You can use 3% of raw water, 1%-3% of bleach water, or 3% of peracetic acid solution. Sprinkle doors and windows 1 hour after spilling.
2. "Hidden Project" is the biggest hidden danger
For example, whether the pipelines, lines, and equipment of various facilities such as water supply, air conditioning, and ventilation in the ceiling have been subjected to closed tests and electrical insulation and resistance tests, whether the connection is firm, whether the joint practices meet the requirements, and whether the flammable materials have been fire-resistant. Combustion treatment and so on are all within the scope of “hidden projects†and are no longer inspectable after the first installation. When the old house is renovated, reopening these areas is a good opportunity to eliminate hidden dangers. The owners must strictly inspect and remove the “hidden project†left over from the past.
3, the old house should not be free to dismantle the wall
Because after a period of deposition, the interior of the house has no firmness when new houses are built, and we also have very few drawings. Therefore, do not smash the load-bearing walls during the demolition. This will bring great security risks to the houses and should be avoided.
Second-hand House Renovation Information Window Furniture Houses House Renovation New Homes Decoration Budget Floor Tiles Floor Tiles Kitchen Wall Tiles Bathroom Tiles Bathroom Doors Toilet Ceiling Material Bathroom Wall Tiles Toilet Waterproof Price Bathroom Ceilings Whole Bathroom Toilet Design Toilet Waterproof Floor Tiles Ceramic Tiles Price Kitchen Tiles
Shower system includes many types shower products, such as rain shower , hand shower, sliding bar-Various styles let you have luxurious shower experience.
Shower system can be made of different materials, such as copper and stainless steel. High quanlity meterials ensure quality and longevity.
Shower system are available in a variety of colors. Electrical chrome plated is still the most popular one though more and more colorful finished showers are supplied in the market. The production process can be PVD, electrical plated, powder coated, ORB etc. Color options have black, matt black, white, matt white, nickel brushed, gold, rose gold, gun mental etc.
Shower System,Shower Set,Shower System Kit,High End Shower Systems
Kecheng Trading Company Limited , https://www.jmttl.com