Rough Housing Acceptance Standards Blank House Acceptance Points

The acceptance of rough houses is a link that many owners have neglected. The acceptance of rough houses is of utmost importance. Do not neglect the simple and necessary acceptance of the entire room because you are too happy with the new house keys or other reasons. The inspection of the home inspection room directly affects whether or not your subsequent renovation can be carried out smoothly and with high quality.

Rough Housing Acceptance Standards Blank House Acceptance Points

First, the acceptance criteria of rough housing

1、The exterior finish completes the decoration

All exterior finishes, including balconies and rain covers, should be completed according to design documents.

2. Complete the decoration of public parts, electrical pipes, etc.

Common parts, public facilities, various pipelines (giving, discharging, rainwater, warmth, and heat), electrical equipment (distribution boxes, cabinets, plates, sockets, switches, lamps and lanterns), etc. shall all be completed in accordance with the design documents, and It is required to complete various test items.

3, pipeline acceptance and debugging

All kinds of pipelines shall be inspected for water passing, pressure test, pass ball test and commissioning of heating and thermal engineering.

4, roof water storage experiment

The roofing project carries out water storage and watering tests.

5. Check the construction of the room within the door

Doors with prefabricated floor or cast-in-place roof are to be used for all rooms. They shall be plastered and leveled with putty to achieve dense and crack-free board seams, smooth and error-free tables, smooth surfaces, and uniform color and angle. Straight; The ground floor concrete of each room within the door should be flat, compacted, to achieve a firm bond, no cracks.

  

6, strict waterproofing

The room with waterproof requirements should be planned in strict accordance with the construction requirements of the waterproof layer and the protective layer. Two water storage tests should be conducted during acceptance to ensure that there is no leakage.

7, the floor drain, slope design pass

The floor drain and the flooding slope are in line with the design requirements, so as not to pour water, the joint is smooth and smooth, and there is no leakage.

8, cement floor reserved height

The height of the concrete ground floor in various rooms should be considered for the height dimensions when re-decorating.

Second, rough housing acceptance points

1, doors, windows

The door is the most easily forgotten place. After the owner happily opened the door with his key, he was most concerned with seeing what the house looked like. The appearance and appearance of the door were left behind. This process is absolutely undesirable. Now the houses are installed with anti-theft doors. After opening the door, you should carefully observe and touch the surface of the door by hand to see if it is flat and there are no scratches or areas that have been impacted. Look at the door frame visually, because the door frame is not correct. Will directly affect the use of your actual life in the future, but also should try to lock back and forth to see if the normal opening, closing, if you encounter problems to timely reflect the property to be replaced.

Today's homes use steel windows and use hollow glass. During acceptance, we must inspect the glass and window frames of each room and carefully look for any debris, water marks, scratches, or glass in the glass. There is water vapor; the window frame is not correct, whether the window is open and closed properly, whether it can reach 90 degrees when the window is opened, and whether the waterproof window is pasted out by hand or not, depends on whether the windows of each window are installed. All right.

  

2, wall, ground

In the acceptance of the rough house, the wall surface and the ground are the largest and most critical areas. We must check whether the walls of all rooms are flat or whether the floor of the kitchen or bathroom is empty. If the unevenness of the wall will cause a lot of trouble for the decoration in the future, the unevenness of the ground will also affect the later paving or laying of the floor. If there is a hollow area in the wall of the bathroom and the kitchen, it will be easy to fall off after the decoration is attached to the tile.

In order to avoid and early detection of these problems, we can use some lively, easy-to-use methods of earth testing to find a longer bar on the wall and see if the bar is attached to the wall, if there is 1 - The error of 2mm is within the scope of the national standard. If the error is large, the property must be hired to pick up the worker to rehash the wall. We can also take the book and use one of the 90-degree right angles against the corner to see if it is perpendicular to the 90-degree angle of Yin Yang. To see if there is an empty drum on the wall, you can use a small hammer to test and judge whether there is empty drum on the wall by sounding when you tap.

3, electricity

When checking the house, check whether there is electricity in each room. Each room has a simple light bulb to see if they are all normal. The outlets in each room must not be forgotten. It is not very expensive to sell simple electroscopes on the market. We can use test pencils to test whether each outlet has electricity. If you don't have a test pencil, you can use the soil method and use a mobile phone charger or hair dryer.

4, water

In the rough room, toilets and kitchens are well-routed water lines, but most of them have no taps. We can take a bucket of water and pour it into the pipeline to see if the water is blocked or not. If you hear the sound of the water, you can say that the water is very happy. The floor of the bathroom should be well waterproofed, but it is impossible to do a water-blocking test during the inspection because of the conditions. Therefore, we must let the decoration workers do a water-blocking test before the renovation and look for water leakage after 24 hours.

  

5, ventilation system

Ventilation systems are a big problem that can easily be overlooked during home inspections. Flues and exhaust ducts are places that are easy to leave hidden dangers for daily life.

In short, to remind the majority of owners, in the acceptance of the rough room, must take into account all aspects of the room, so as to be ready for the future renovation.