With the development of the construction industry, more and more new types of load-bearing sheets have emerged in front of us. The floor support board is one of them. It not only changes the architectural model of the floors in traditional buildings, but also creates more of the construction industry. The great value has been welcomed by various construction industries. Then what is special about floor boards? What are the advantages of floor boards? How to correct construction? Xiao Bian will take everyone with you today to find out.
What is a floorboard?
Although the floor-to-slab combination floor slab is adopted on the other side of the world in Europe, it also has its own drawbacks. The defect of the floor-to-board combination floor slab is that it requires multiple trabecules, and the floor has a higher net height, and it also needs the bottom of the steel plate. Need to do fire prevention treatment, so the construction must be high and troublesome; but the advantages of the floor plate assembly floor far more than shortcomings, it has a short construction period, can save construction manpower, and floor boards combined floor slabs more convenient on-site operations , The architectural integrity is better than the prefabricated assembly floor.
What are the advantages of floor boards?
Floor-to-board composite floor slabs are required to have a net thickness of not less than 0.75 mm and an optimum thickness of 1.0 mm or more. In order to facilitate the pouring of concrete, the average groove width of floor-to-wall composite floor slabs must not be less than 0.55 mm. When the cylindrical head studs are installed in the tank, the floor height of the floor plate of the floor plate is required to be no more than 80 mm. In addition, it is also necessary to ensure that the surface layer of the floor slab of the floor-to-ceiling slab has a protective layer to avoid atmospheric erosion during use.
Floor Board Construction Process Guidance
Before the construction of floor-to-board composite floor slabs, a layout plan should be drawn to show various sizes and connection methods; then, the types, specifications, and quantities of the plates should be counted. When the floor-to-board composite floor slabs are under construction, attention must be paid to the rust prevention of the structure. In addition to pouring concrete near the rest, rust-prevention treatment is required; when pouring concrete, the floor-laying boards laid can be directly tied with reinforcing steel for pouring.
What is a floorboard?
Although the floor-to-slab combination floor slab is adopted on the other side of the world in Europe, it also has its own drawbacks. The defect of the floor-to-board combination floor slab is that it requires multiple trabecules, and the floor has a higher net height, and it also needs the bottom of the steel plate. Need to do fire prevention treatment, so the construction must be high and troublesome; but the advantages of the floor plate assembly floor far more than shortcomings, it has a short construction period, can save construction manpower, and floor boards combined floor slabs more convenient on-site operations , The architectural integrity is better than the prefabricated assembly floor.
What are the advantages of floor boards?
Floor-to-board composite floor slabs are required to have a net thickness of not less than 0.75 mm and an optimum thickness of 1.0 mm or more. In order to facilitate the pouring of concrete, the average groove width of floor-to-wall composite floor slabs must not be less than 0.55 mm. When the cylindrical head studs are installed in the tank, the floor height of the floor plate of the floor plate is required to be no more than 80 mm. In addition, it is also necessary to ensure that the surface layer of the floor slab of the floor-to-ceiling slab has a protective layer to avoid atmospheric erosion during use.
Floor Board Construction Process Guidance
Before the construction of floor-to-board composite floor slabs, a layout plan should be drawn to show various sizes and connection methods; then, the types, specifications, and quantities of the plates should be counted. When the floor-to-board composite floor slabs are under construction, attention must be paid to the rust prevention of the structure. In addition to pouring concrete near the rest, rust-prevention treatment is required; when pouring concrete, the floor-laying boards laid can be directly tied with reinforcing steel for pouring.
Towel Rack For Pool,Towel Rack With Shelf,Stainless Steel Towel Rack,Stainless Steel Towel Rail
Heshan Zhongxin Sanitary Ware Ind., Co., Ltd , https://www.baolongfaucets.com