Explosion-proof box material: aluminum alloy, steel plate welding, stainless steel, engineering plastics
Explosion proof principle:
The most explosion-proof and increased safety type for factory explosion protection
The Exd II flameproof type completely encloses the components of the device that may ignite the explosive gas mixture in an enclosure that can withstand any joint or structural gap through the enclosure and the flammable mixture that penetrates inside the enclosure explodes internally without damage. And can guarantee the internal flame gas to reduce energy when passing the gap, not enough to detonate the shell gas.
Exe II Increased Safety Type Excitation type that does not produce arcs or sparks under normal operating conditions Electrical equipment that takes additional measures to increase its safety to prevent the possibility of dangerous temperatures, arcs, and sparks in its internal and external components, Further protection measures are taken on the structure to improve the reliability and safety performance of the equipment.
What is the standard production process requirement for the explosion-proof box?
The following points are referenced:
Must be accepted according to the national inspection standard GB3836 series
1. Before fastening the lid, apply a 0.1-0.3mm3# calcium grease to the explosion-proof surface of the box.
2. When tightening the lid, tighten the screws with a tightening torque of 18 N.M.
3. Use a plug gauge to check the flameproof gap after the cover is fastened. The maximum gap is less than 0.1mm.
4. After the assembly is completed, clean the surface of the box and use foamed plastics for proper packaging to avoid damage to the box structure and the surface spray coating during transportation and installation.
5. Check the main fitting dimensions of the parts and components before assembly.
6. The explosion-proof box assembly process does not allow parts to scratch, touch, scratch the explosion-proof surface.
7. When tightening screws and nuts, it is forbidden to strike or use inappropriate screwdrivers and wrenches.
8. Press the test before assembly of electrical components as required, pressurize 1MP, maintain 10-12S. It should ensure no obvious deformation of the box and no leakage.
9. Pay attention to the proper position when assembling electrical components and install them securely.
10. The line number is marked with a marking machine and the line number is clear and complete. Wiring attention to line sequence color and wire diameter.
11. After the installation of electrical equipment according to electrical design requirements for debugging.
12. After the explosion-proof box is commissioned, tighten the wiring harness, install the slot cover, and note whether the ground cable is connected. The grounding wire can be wound with Φ20-30 round bars for 6-8 turns to reduce the movement damage.
13. The explosion-proof surface of the parts after finishing must not be corroded or have defects such as bumps, scratches, etc. that affect performance, life or appearance.
14. All welds shall be welded on both sides. Weld defects such as sand blasts shall not be available. Welds shall be flattened after welding.
15. Threaded holes and covers are fitted.
16. Before spraying and derusting the explosion-proof box, remove the grease and dirt on the surfaces of the steel parts with organic solvents, alkalis, emulsifiers, and steam.
17. All the processing steps are completed and the internal and external surfaces are electrostatically sprayed. Spray with anti-corrosion weathering paint.