Electric floor heating site specification

During the entire construction process of electric floor heating, not only do the floor heating personnel have to do with the rules and procedures, but also the laying of the cement floor. Floor heating is an overall process. For some details on the laying of cement on site, we can use it for reference. 1. Construction site warmth...80 couples wedding room petty bourgeoisie wedding room fashion fashion embodiment · A product member exclusive cash discount · Mediterranean style blue + white · mosaic even for the home art young hot mom 50,000 to create two homes Shop No. 1 Cash Discount Coupon · Floor heating This winter is not afraid of cold · Small apartment mixes new trend · 200,000 luxury to create 95 flat space · Dulux paint cost-effective big PK · TV wall small space big content

During the entire construction process of electric floor heating, not only do the floor heating personnel have to do with the rules and procedures, but also the laying of the cement floor. Floor heating is an overall process. For some details on the laying of cement on site, we can use it for reference.


1. Smoking is forbidden on the construction site's warm area.
2. The construction personnel must wear soft flat shoes and use flat-head hoe construction.
3. The ratio of cement (325) and yellow sand (medium sand does not contain river sand) is not lower than 1:3, ie C20.
4. Construction tools should be handled with care so as not to damage the heating cables.
5. It is prohibited to stack tools, tiles and other items on the heating cable.
6, marble, larger tiles should be two with the construction.
7. It is not allowed to modify the spacing of the warm lines during construction.
8, the floor shop room, the thickness of the cement layer is not less than 2cm, the flatness error is less than 0.5cm.
9, shop marble, tiled room, peripheral shrinkage of not less than 0.8cm (baseboard cover is appropriate).
10. After the construction of the overburden layer is completed, the construction of the overburden layer can be completed only after 3 days. In the subsequent construction of the type of work, the construction of the ladder and the workbench should be carried out under the foot.
12. The end of construction of the floor heating is prohibited, and drilling, cutting, shooting nails, knocking and other destructive behaviors are strictly prohibited.
13. After the completion of the construction of the floor heating, it is forbidden to directly touch the ground with high-temperature items (such as electric stoves, stoves, sun lamps, etc.).
14, bathroom construction, wall tiles posted before the floor heating can be carried out.
15. Before the construction of the bathroom floor heating, the ground must be closed to the water test, and confirm that there is no problem before the construction.
16. It is forbidden to step on the warmer line immediately after the warmer line is covered for other types of work.
17. It is forbidden for painters to work on the top of the warming line when it is not covered.
18. It is forbidden to place chemical raw materials in the laying area of ​​the warm line.

Space effect fig del floor cement space marble room home floor tile fashion small apartment bathroom wall tile overall bathroom

Steam Trap

Steam Trap,Free Floating Ball Type,Steam Flange Steam Trap,High-Temperature Steam Trap

Zhejiang Meide Machinery Co.,Ltd , https://www.meidemachinery.com