Bao Lan integrated ceiling has a good decorative effect and the price is cheaper than other materials, so it has become the decoration of choice for the majority of ceiling decoration materials, here to introduce Bao Lan integrated ceiling installation process.
1. Unlike general construction, preparatory work for ceiling construction is particularly important, including steps such as measurement and material selection. The good work done at this stage can greatly reduce the trouble in construction and guarantee the safety of future use.
2. Before the formal construction, the worker first uses the horizontal pipe to measure the level of the ink line on the wall surface. Only when the actual level of the foundation line is ensured, the suspended ceiling installed later will not be tilted or there will be gaps.
3, Bao Lan integrated ceiling needs to be fixed on a solid wooden keel frame, so carefully selected before the keel material has become an essential step, it is recommended that you try to choose to hold the nail force better pine material.
4, because the keel is wooden, so we must pay attention to fire prevention, the standard practice is that the surface of the keel is now evenly painted fire retardant paint, etc. The whole keel is white, and then nailed to the wall, which can ensure its place of contact with the wall Also brushed into fireproof paint.
5. The construction of suspended ceilings includes steps such as playing keel, plastering, handling nails, caulking, and attaching bandages. Each of these steps is very important. Everyone must strictly supervise whether the workers have done a bit in the decoration.
6, after the surface of the keel after the completion of the fire treatment can be combined, workers will use a nail gun in the two keel joints obliquely 45 degrees to fix. At this time, it is necessary to master the strength to prevent the keel from cracking.
7. After fixing the keel frame, it is necessary to fix the frame on the wall. At this time, it is necessary to carefully check whether the spacing between the frames is not more than 300 mm to have sufficient fastness. Otherwise, the gypsum board on it easily sinks and breaks.
8, the next step is to officially put on the gypsum board, it is best to allow workers to use drywall screws stainless steel fixed gypsum board, such nails will not rust, in the future can guarantee the gypsum board a long time beautiful.
9. The nails on the gypsum board are usually treated with rust-proof eye putty, and its practical cement to fill the nail holes is a more economical way to save money. And the effect after the treatment is not worse than nail eye putty.
10. The gap between the two plasterboards must be handled in the next step, otherwise there will be obvious cracks in the future. General workers will use 901 glue and gypsum powder after mixing.
11, after the best use of anti-crack tape in the surface paste it, can prevent thermal expansion and contraction caused by the top cracking. When sticking, pay attention to the use of a spatula to remove the air bubbles on one side and allow the tape and plasterboard to be completely and tightly combined.
12. The later stage is the stage of special ceiling molding. The craftsmanship and experience of the workers will directly affect the future appearance. Therefore, the decoration company should be asked to dispatch experienced workers to carry out the construction.
13, for the special shape of the ceiling, the post-processing is very important. The ceilings, such as circular and wavy, all require experienced masters to repair them slowly with a spatula. This is the most important process for forming the entire ceiling.
14. After the basic shape is repaired, the edges of the ceiling shall be sanded again and the edges and edges of the edges shall be removed. Must be patient and careful when handling, otherwise it will affect the appearance in the future.
15. After a few days of hard work, the ceiling of the home can be completed. As long as we grasp the key links in the above construction, we can guarantee the beauty and safety of Baolan integrated ceiling.
The relevant information about Baolan Ceiling was introduced here for everyone. I hope this article will help you. If you still have something that you don't understand, you can leave a message for Xiaobian at the bottom. We will answer you as soon as possible.
MelKite self-cleaning ceiling self-cleaning ceiling principle knowledge
Integrated ceiling chooses Fusheng integrated ceiling
Integrated ceiling purchase new flying integrated ceiling is a good helper
Kellett integrated ceiling to lead the new trend of Chinese home American style
Baolan integrated ceiling integrated ceiling integrated ceiling brand decoration home
[Energy Saving]: Switch it on and it lights up in low light, in the day it automatically turns off whilst the solar panel absorbs the suns energy and charges up its batteries.No longer have to pay for electricity bills or replacing batteries.
[Superior Performance]: This outdoor Solar Light adopt 2020 newly 150mAh solar panel with built-in 800mAh NI-MH battery, each solar lights can light up for up to 8-12 hours after 6-8h full charge.
[Advanced Design]: Equipped with 12 led instead of 8 led to provide brighter light. Full PC lampshade increase irradiation area.High strength ABS Withstand 200KG, don't need to worry about automobile and kids stepping on.
[IP68 Waterproof]:Our disk lights adopt IP68 dust prevention water proofing designs,even the switch is covered with moisture-proof silicone. Zero problems for a raining day.[Easy to Install]: Just press the heavy-duty stakes into the ground, push the button once in the back and it start working forever.No messy wiring or electricity bills needed. Of course you would have to place these solar ground lights where it gets maximum exposure to sunlight.
Solar Pathway Light,Garden Lawn Lights,Solar Lawn Lights,Solar Decoration Light
Ningbo Wason Lighting Technology Co.,Ltd , https://www.nbwasonled.com